Reach Dredging project details

Sl NoName of EmployerNature of workLoI / Work Order No. & DateContract price In Indian Rs.Date of completion of work(MM/DD/YY)
1Chief Executive Director, Wular Conservation & Management Authority (WUCMA) Forest Complex, Silk Factory, Rajbagh, Srinagar, KashmirDredging of Wular Lake & its Feeder Channels and Strengthening of Embankment of Wular Lake for Conservation and Management of the Lake as prescribed under Management Action PlanCED/WUCMA/2018-19/144-49 dated 28/01/2019Rs. 13.02 Crores11/01/2019
2Chief Engineer, Irrigation & Flood Control Department, Kashmir Engineering Complex, Near Silk Factory, Rajbagh, Srinagar, Kashmir – 190008Construction of Channel Across Hokersar Wetland along old alignment from RD 13182 M to RD 16713 M of Flood Spill Channel including its side slope protection and Dredging of drainage / escape channels flowing into the Hokersar WetlandLoI No. DB/8661-64 dated 15/09/2018 & Allotment Letter No. DB/179 of 2018-19 dated 01/02/2019Rs, 21.43 Crores06/27/2019
3Executive Engineer, Inland Waterways Authority of India, Ministry of Shipping, Government of India, Guwahati, AssamDredging and providing fairway maintenance for Least Available Depth of 2m along with provision of navigational aid for the Stretch – B between Ch. 73.00 km to Ch. 95.00 km of Barak River (NW-16) for shipping and navigationIWAI/Hy/106-NW/Barak/2016/1 dated 08/12/2016Rs. 14.83 Crore3/1/2019
4Chief Engineer, I&FC Department, Kashmir Engineering Complex, Near Silk Factory Rajbagh, SrinagarDredging of OFC (River Jhelum) from Sopore to Sheeri Baramulla at various spotsDB/107 of 2016 dated 22/11/2016Rs. 26.77 Crores3/31/2018
5Chief Engineer, I&FC Department, Kashmir Engineering Complex, Near Silk FactoryDredging of River Jhelum ranging from Bell Mouth to Flood Spill Channel to Panzinara of Kashmir Valley at various spotsDB/97 of 05/2016 dated 28/05/2016Rs. 20.23 Crores3/31/2018
6Chief Engineer-III
Inland Waterways Authority of India, A-13, Sector-1, Noida – 201301 (U.P.)
Dredging Activity in the River Muriganga at Lot-8 for Ganga Sagar Mela during 2018 by CSD Krish-11 UnitIWAI/MD/266/2016-17 Dated 04-12-2017Rs. 2.58 Crore1/16/2018
7Orissa Construction Corporation Limited
Gopabandhunagar Unit-VIII Bhubaneswar
Dredging in River Luna by Cutter Suction Dredger & Disposals on area as designated (Reach I to IV)Lr.No. 87 Dated 29.12.2012Rs. 3.91 Crore10/15/2013
8Paradip Port Trust, Paradip Port-754142, OdishaDredging of Wet Basin, Deep Sea Trawler Berth/Ro-Ro Jetty and approachesCE/HWDI/ACCTS-43/2011Rs. 1.45 Crore6/23/2013
Total Work Order Executed104.22 Cr

The % of work completion & schedule date of completion of work order in hand: -

Sl NoName of EmployerNature of workLoI / Work Order No. & DateContract price In Indian Rs.% of work completedSchedule date of completion
1Managing Director, Karnataka State Minerals Corporation Limited, Fifth Floor, TTMC, A Block, BMTC Building, Shantinagar, KH Road, Bangalore - 560027Dredging / Desilting in Chakara Dam Submergence Area of Kundapura Taluk, Udupi District925/KSMCL/Desilting/Sand/Chakara/
2021-22/328 dated 21.05.2021
Rs. 2.28 CroresNot yet started02/21/2022
2Superintending Engineer, Irrigation Circle, VijayawadaDesilting of Silt from the foreshore of Prakasam Barrage from KM 0.500 to KM 1.000SE/IC/VJA/DB/ATO/429 M dated 30.04.2021Rs. 5.00 CroresNot yet started04/30/2022
3Superintending Engineer, Irrigation Circle, VijayawadaDesilting of Silt from the foreshore of Prakasam Barrage from KM 1.400 to KM 2.000SE/IC/VJA/DB/ATO/430 M dated 30.04.2021Rs. 6.17 CroresNot yet started04/30/2022
4Superintending Engineer, Irrigation Circle, VijayawadaDesilting of Silt from the foreshore of Prakasam Barrage from KM 3.500 to KM 3.700SE/IC/VJA/DB/ATO/431 M dated 30.04.2021Rs. 5.31 CroresNot yet started04/30/2022
5Superintending Engineer, Irrigation Circle, VijayawadaDesilting of Silt from the foreshore of Prakasam Barrage from KM 3.900 to KM 4.100SE/IC/VJA/DB/ATO/432 M dated 30.04.2021Rs. 4.98 CroresNot yet started04/30/2022
6Superintending Engineer, Irrigation Circle, VijayawadaDesilting of Silt from the foreshore of Prakasam Barrage from KM 4.300 to KM 4.500SE/IC/VJA/DB/ATO/433 M dated 30.04.2021Rs. 4.88 CroresNot yet started04/30/2022
7Superintending Engineer, Irrigation Circle, VijayawadaDesilting of Silt from the foreshore of Prakasam Barrage from KM 5.700 to KM 6.500SE/IC/VJA/DB/ATO/434 M dated 30.04.2021Rs. 5.22 CroresNot yet started04/30/2022
8Superintending Engineer, Irrigation Circle, VijayawadaDesilting of Silt from the foreshore of Prakasam Barrage from KM 7.500 to KM 8.400SE/IC/VJA/DB/ATO/435 M dated 30.04.2021Rs. 5.58 Crores36%04/30/2022
9Senior Manager (Civil), Odisha Construction Corporation Limited, Gopabandhu Nagar,
Bhubaneswar, Odisha
Dredging of Luna River from RD 11.00Km to 17.00KmOrder No. OCC/SM/HQR/445 dated 28.04.2021Rs. 10.33 Crores50%03/27/2022
10CED, Wular Conservation and Management Authority (WUCMA), Kashmir Forest Complex,
Rajbagh, Srinagar
Increasing the Water Holding capacity of Wular Lake and its feeder channel (Naaznalla) near Village : Saderkote Payen and Banyari for conservation and management Action Plan01/WUCMA of 2020-21 dated 02/06/2020Rs. 148.59 Crores93.8%06/02/2022
Total Work order in hand198.34 Cr.