At Reach Dredging Ltd., we are sworn to provide the highest standards of service and a have a steady focus on reliability of our services. We offer our services allied to dredging which at a glance are mentioned below:
Sl No | Name of Employer | Nature of work | LoI / Work Order No. & Date | Contract price In Indian Rs. | Date of completion of work(MM/DD/YY) |
---|---|---|---|---|---|
1 | Chief Executive Director, Wular Conservation & Management Authority (WUCMA) Forest Complex, Silk Factory, Rajbagh, Srinagar, Kashmir | Dredging of Wular Lake & its Feeder Channels and Strengthening of Embankment of Wular Lake for Conservation and Management of the Lake as prescribed under Management Action Plan | CED/WUCMA/2018-19/144-49 dated 28/01/2019 | Rs. 13.02 Crores | 11/01/2019 |
2 | Chief Engineer, Irrigation & Flood Control Department, Kashmir Engineering Complex, Near Silk Factory, Rajbagh, Srinagar, Kashmir – 190008 | Construction of Channel Across Hokersar Wetland along old alignment from RD 13182 M to RD 16713 M of Flood Spill Channel including its side slope protection and Dredging of drainage / escape channels flowing into the Hokersar Wetland | LoI No. DB/8661-64 dated 15/09/2018 & Allotment Letter No. DB/179 of 2018-19 dated 01/02/2019 | Rs, 21.43 Crores | 06/27/2019 |
3 | Executive Engineer, Inland Waterways Authority of India, Ministry of Shipping, Government of India, Guwahati, Assam | Dredging and providing fairway maintenance for Least Available Depth of 2m along with provision of navigational aid for the Stretch – B between Ch. 73.00 km to Ch. 95.00 km of Barak River (NW-16) for shipping and navigation | IWAI/Hy/106-NW/Barak/2016/1 dated 08/12/2016 | Rs. 14.83 Crore | 3/1/2019 |
4 | Chief Engineer, I&FC Department, Kashmir Engineering Complex, Near Silk Factory Rajbagh, Srinagar | Dredging of OFC (River Jhelum) from Sopore to Sheeri Baramulla at various spots | DB/107 of 2016 dated 22/11/2016 | Rs. 26.77 Crores | 3/31/2018 |
5 | Chief Engineer, I&FC Department, Kashmir Engineering Complex, Near Silk Factory | Dredging of River Jhelum ranging from Bell Mouth to Flood Spill Channel to Panzinara of Kashmir Valley at various spots | DB/97 of 05/2016 dated 28/05/2016 | Rs. 20.23 Crores | 3/31/2018 |
6 | Chief Engineer-III Inland Waterways Authority of India, A-13, Sector-1, Noida – 201301 (U.P.) | Dredging Activity in the River Muriganga at Lot-8 for Ganga Sagar Mela during 2018 by CSD Krish-11 Unit | IWAI/MD/266/2016-17 Dated 04-12-2017 | Rs. 2.58 Crore | 1/16/2018 |
7 | Orissa Construction Corporation Limited Gopabandhunagar Unit-VIII Bhubaneswar | Dredging in River Luna by Cutter Suction Dredger & Disposals on area as designated (Reach I to IV) | Lr.No. 87 Dated 29.12.2012 | Rs. 3.91 Crore | 10/15/2013 |
8 | Paradip Port Trust, Paradip Port-754142, Odisha | Dredging of Wet Basin, Deep Sea Trawler Berth/Ro-Ro Jetty and approaches | CE/HWDI/ACCTS-43/2011 | Rs. 1.45 Crore | 6/23/2013 |
Total Work Order Executed | 104.22 Cr |
Sl No | Name of Employer | Nature of work | LoI / Work Order No. & Date | Contract price In Indian Rs. | % of work completed | Schedule date of completion |
---|---|---|---|---|---|---|
1 | Managing Director, Karnataka State Minerals Corporation Limited, Fifth Floor, TTMC, A Block, BMTC Building, Shantinagar, KH Road, Bangalore - 560027 | Dredging / Desilting in Chakara Dam Submergence Area of Kundapura Taluk, Udupi District | 925/KSMCL/Desilting/Sand/Chakara/ 2021-22/328 dated 21.05.2021 | Rs. 2.28 Crores | Not yet started | 02/21/2022 |
2 | Superintending Engineer, Irrigation Circle, Vijayawada | Desilting of Silt from the foreshore of Prakasam Barrage from KM 0.500 to KM 1.000 | SE/IC/VJA/DB/ATO/429 M dated 30.04.2021 | Rs. 5.00 Crores | Not yet started | 04/30/2022 |
3 | Superintending Engineer, Irrigation Circle, Vijayawada | Desilting of Silt from the foreshore of Prakasam Barrage from KM 1.400 to KM 2.000 | SE/IC/VJA/DB/ATO/430 M dated 30.04.2021 | Rs. 6.17 Crores | Not yet started | 04/30/2022 |
4 | Superintending Engineer, Irrigation Circle, Vijayawada | Desilting of Silt from the foreshore of Prakasam Barrage from KM 3.500 to KM 3.700 | SE/IC/VJA/DB/ATO/431 M dated 30.04.2021 | Rs. 5.31 Crores | Not yet started | 04/30/2022 |
5 | Superintending Engineer, Irrigation Circle, Vijayawada | Desilting of Silt from the foreshore of Prakasam Barrage from KM 3.900 to KM 4.100 | SE/IC/VJA/DB/ATO/432 M dated 30.04.2021 | Rs. 4.98 Crores | Not yet started | 04/30/2022 |
6 | Superintending Engineer, Irrigation Circle, Vijayawada | Desilting of Silt from the foreshore of Prakasam Barrage from KM 4.300 to KM 4.500 | SE/IC/VJA/DB/ATO/433 M dated 30.04.2021 | Rs. 4.88 Crores | Not yet started | 04/30/2022 |
7 | Superintending Engineer, Irrigation Circle, Vijayawada | Desilting of Silt from the foreshore of Prakasam Barrage from KM 5.700 to KM 6.500 | SE/IC/VJA/DB/ATO/434 M dated 30.04.2021 | Rs. 5.22 Crores | Not yet started | 04/30/2022 |
8 | Superintending Engineer, Irrigation Circle, Vijayawada | Desilting of Silt from the foreshore of Prakasam Barrage from KM 7.500 to KM 8.400 | SE/IC/VJA/DB/ATO/435 M dated 30.04.2021 | Rs. 5.58 Crores | 36% | 04/30/2022 |
9 | Senior Manager (Civil), Odisha Construction Corporation Limited, Gopabandhu Nagar, Bhubaneswar, Odisha | Dredging of Luna River from RD 11.00Km to 17.00Km | Order No. OCC/SM/HQR/445 dated 28.04.2021 | Rs. 10.33 Crores | 50% | 03/27/2022 |
10 | CED, Wular Conservation and Management Authority (WUCMA), Kashmir Forest Complex, Rajbagh, Srinagar | Increasing the Water Holding capacity of Wular Lake and its feeder channel (Naaznalla) near Village : Saderkote Payen and Banyari for conservation and management Action Plan | 01/WUCMA of 2020-21 dated 02/06/2020 | Rs. 148.59 Crores | 93.8% | 06/02/2022 |
Total Work order in hand | 198.34 Cr. |